Can I trust the estimate enough to put my number on it?

Everything your senior estimator needs to work the number.

TED builds the estimate around the way your company actually performs the work — your crews, production, equipment, pricing, vendors and subcontractors. Your estimator sees what is complete, what is missing, where the risk is and exactly where their judgment is needed.

3.1 — Your Setup

Built around how your company performs the work.

Switch out crews. Edit margins. Edit labor or equipment. The estimate is built around the way your company estimates — your crews, production rates and pricing sit underneath every number.

estimate / 01-general-conditions
01-General Conditions3
BID ITEMQTYUNITCREWHOURSRATEEXT COSTMARGINPRICE/UNITTOTAL PRICE
1.11EA1y Truck + Driver20.000.05$10,060.208.49%$11,844.47$11,844.47
Labor
NAME#COSTRATEEXT
LB Truck Driver (TLBD)1$39.22$39.22/hr$784.40
Equipment
NAME#USAGECOSTRATEEXT
Truck and Lowboy (8TKXLB)1100%$78.79$78.79/hr$1,575.80
Material
Subcontractor
NAMEQTYUNITCOSTPOST-TAXEXT
Lowboy-Large · ABC Trucking Q-448110EA$700$770.00$7,700.00
3.2 — Behind the Number

See exactly what is behind every number.

Open any estimate item and see the crew, scope, quote, quantities, drawing references and assumptions behind it. The contractor uploads drawings and documents, follows up with suppliers and subcontractors, and uploads incoming quotes. TED organizes the documents, matches quotes to estimate items, and highlights what is missing. Your estimator sees what is complete, what is missing and where the risk is — and can change anything before the bid goes out.

estimate / 8-inch-water-main

8” DIP Water Main

210 LF · $81/LF

Ext. Cost

$19,331

CrewTrench Crew A11.1 hrs · 19 LF/hr$2,321
QuoteAcme Pipe Co. — Quote.pdfAttached
ScopeDepth 0’- 5’ · Native Backfill · No Dewatering · No Rock
Takeoffs & References

Assumptions: Rock export not included · Night work not included · Depth per profile

3.3 — What Needs Me

See exactly where your judgment is needed.

The Department keeps the estimate moving and brings your estimator the decisions that need their judgment. See what is quoted, approve assumptions, resolve estimating decisions and make revisions without another handoff. Everything else is handled underneath, so their attention lands only on what needs their call.

leland-wild / what needs me
What Needs Me4 decisions
Rock export assumption
Assumed excluded from base bid
Supplier quote — HDPE pipe
Acme $82,400 · Ferguson $85,100
Night work production
Assumed 70% of normal production
Alternate — Add rock export (Add. 1)
+$42,000 to base
Dewatering allowance approved · 2h ago
3.4 — Proposal Flow

Turn the estimate into the proposal.

Combine estimate items, rename proposal lines, edit inclusions and exclusions, then preview and generate the final proposal. No rebuilding the bid somewhere else. The estimate your estimator reviewed is the proposal that goes out.

proposal-builder
ESTIMATE
Mobilization
Earthwork
Water
Storm
Concrete
Restoration
PROPOSAL
General Conditions
Sitework
Underground Utilities
Concrete
Leland_Wild_Proposal.pdf
PROPOSAL HISTORY
Proposal v1Sep 16, 2026Initial submissionView
Draft v1Sep 15, 2026Internal reviewView
Draft v0Sep 14, 2026Estimate completeView

The estimate is in front of your estimator. Now see what the Department is producing.

Explore Oversight
TED

The Estimating

DEPARTMENT

© 2026 The Estimating Department. All rights reserved.

The Estimating Department is operated by Hungerford.